
It's time for monthly challenges again for Charming Girls Quilt Club. I had 8 challenges in October and I was able to finish 7 of them. Most of them were shown in earlier posts.

These paper pieced ornaments were one of the items. I finished those while we were at Camp Fitch.

Also, these reuse grocery bags. I finished these 4 at Camp Fitch also.

This was the only challenge I didn't completely finish - a banner called On a High Note. I got the top done, but it still needs quilted and bound - so that will be one of my November challenges.

My second November challenge will be to quilt and bind Atlantic Flyway - my project from Maine.

This is my doorprize from Maine - I got the table runner top done, but it too needs quilting and binding in November.

Another challenge is to quilt and bind this mothers and daughters quilt. The top has been done for some time.

These 2 name banners will be Christmas gifts so they need to be done.

And this too is a potential Christmas gift - Swanky. I would like to get the quilt top done in November.
No comments:
Post a Comment